From L.A. County Public Works - Flood Maintenance (this is the area between Lincoln and Chaney Trail, just north of Loma Alta - often referred to as the wash.)

I want to give you a heads-up for our upcoming maintenance at Lincoln SPS. Other than the routine minor grounds keeping, we really haven't done any serious maintenance at the SPS for the 2 yrs take I have been assigned here.

But, the SPS, especially the big pile of dirt at the southern end (visible from Loma Alta Dr.), has been scarred by deep erosion during the last two storm seasons. We want to go in and do maybe 1-1/2 week's work dressing up the hill slopes. All work is confined on site. We will have no hauling of material in or out. Other than a single piece of rental earth work construction equipment operating, there will be a water truck for dust control, small PU's for the supervisors checking on the job, and a fuel tender for occasional re-fueling of the equipment.

The work is necessary. We plan to begin 2 week from now. Hours of operations is from 7:30 A.M. to 4:00 P.M., M-F. Pls notify on our behalves the HOA, and any other concerned citizens.

No comments: